+86-029-81161513
  • Phone

    +86-029-81161513

  • Address

    23 F, Building B, Zhong Tou International Building, No.10 Jin Ye I Road, High-Tech Zone, Xi'an, Shaanxi, China 710077

  • E-mail

    info@vigorpetroleum.com

Features:

Without gun power and ignitor, which is convenient for transportation and safe operations.

Bridge plug and setting tools conveyed by cable, the operations duration is shorter and with high efficiency.

With less accessories, and less operation personnel, the operations cost is lower

Adopted full hydraulic power structure, easy to operate, and lower rate of trouble shootings, and easy maintenance

Pressure balancing system design, the pull force will not be effected by the well depth and mud density

The breaking strength is not less than 45 tons, and with large stroke, which can be adapted to the bridge plugs from a variety of companies.

By address in program, the function of choosing the firing gun can be setup for prevent  from miss-firing in perforation gun combination operations.

Real time monitoring and record setting force, setting stroke, and complete setting process recording

new releasable unit design: when the tools can not retrieved from bridge plug, the releasable unit can drop the bridge plug to prevent from downhole accident.


Wireline setting tool.jpg 

Specifications:

Temperature   150℃(300℉)/175350/204400℉

Pressure   140Mpa20000psi

OD:     89mm3.5in/92mm3.62in

Power Supply:      200VDC0-1A

Max. Setting force   45T/35T

Max. Stroke:     240mm/290mm

Setting force measurement mode:   Real time continuous

Setting stroke measurementReal time continuous

Releasable unit type:   Mechanical/Fusing release