Dissolvable Frac Plug
The Mirage™ Dissolvable Frac Plug utilizes high strength dissolvable material to provide a reliable, durable and cost effective design for temporary zone isolation during stage fracs in both horizontal and vertical wells. The Mirage™ Dissolvable Frac Plugs are constructed of 100% dissolvable...
Description
Mirage™ Dissolvable Frac Plug, a novel temporary zonal isolation tool utilized in hydraulic fracturing and re-completion operations in horizontal wells, is a cutting-edge design with a patent granted to meet specific downhole requirements.
Working principles
● Constructed of 100% dissolvable material, The Mirage™ Dissolvable Frac Plug assures both exceptional isolation performance and reliable dissolution in both traditional brine and even freshwater environments, for both high and low-temperature well.
● It mainly comprises two parts: a fully soluble metal material and a fully soluble short glue barrel. It can be tailored to meet specific geological conditions and construction requirements based on the customer's actual conditions.
● Metal Material: it is made of high-strength magnesium-aluminum alloys or high-polymer materials

The dissolution rate of magnesium-aluminum alloys is primarily related to the liquid temperature and Cl- concentration. Higher temperatures and higher concentrations of Cl- result lead to faster dissolution rates due to the faster breakdown of the passivation film on the alloy surface and an increase in liquid conductivity.
The sealing elements of Dissolvable Frac Plugs are comprised of high-polymer materials, available in various forms such as single rubber sleeves or composites of rubber and resin. They are often made of thermoplastic elastomer blends, which dissolve into a paste-like or granular state for easy removal.

After the construction is completed, there is no need for drilling and grinding, and it can be completely dissolved in a low-concentration KCL solution or clean water medium to realize a full-diameter wellbore. fully dissolvable in a short period, with no milling to remove plug, saving rig time and cost.It is the optimal choice for modernizing oil and gas wells to increase production and efficiency.
Features & Benefits
● Rated to 10,000 psi at temperatures ranging from 77 to 248℉
● Large ID bore for increased flow-back after frac.
● Customized dissolve time.
● Minimum Length Design Results in Faster Dissolution and Less Material.
● The anchoring mechanism employs a bidirectional slip design, ensuring stable locking force during setting and reliable anchoring force during fracturing operations. In case of abnormal situations such as sand plugging, the design features a well-kick and blowout prevention system.
● The shear release mechanism uses a shearable shear ring made of soluble magnesium-based alloy, which is safer and more reliable than traditional shear pin designs and avoids leaving non-soluble residues in the well.
● The plug's top and bottom ends feature interlocking designs to allow for contingency drilling and milling operations in case of emergencies.
Technical Parameters
CASING |
DISSOLVABLE BRIDGE PLUG (BRIDGE PLUG STYLE) |
|||||
Size In. (mm) |
Weight range lb/ft (kg/m) |
Max OD In. (mm) |
Length In. (mm) |
Material |
Temp. Rating ° F (°C) |
Pressure Ratingpsi (MPa) |
3.500 (114.30) |
7.7 - 10.3 (11.46 - 15.18) |
2.677 (68.00) |
17.244 (438.00) |
Dissolvable |
As per Real Downhole Conditions |
10,000psi (68,9 MPa) |
4.000 (101.60) |
10.7 - 18.9 (16.37 - 28.13) |
2.835 (72.00) |
17.756 (451.00) |
Dissolvable |
As per Real Downhole Conditions |
10,000psi (68,9 MPa) |
4.500 (114.30) |
11.6 - 15.1 (17.26 - 22.47) |
3.500 (89.00) |
19.606 (498.00) |
Dissolvable |
As per Real Downhole Conditions |
10,000psi (68,9 MPa) |
5.000 (127.00) |
18.0 - 21.4 (26.78 - 31.84) |
3.740 (95.00) |
19.606 (498.00) |
Dissolvable |
As per Real Downhole Conditions |
10,000psi (68,9 MPa) |
5.500 (139.70) |
23.0 - 26.8 (34.22 - 38.69) |
4.055 (103.00) |
20.787 (528.00) |
Dissolvable |
As per Real Downhole Conditions |
10,000psi (68,9 MPa) |
5.500 (139.70) |
17.0 - 23.0 (25.30 - 34.22) |
4.173 (106.00) |
20.787 (528.00) |
Dissolvable |
As per Real Downhole Conditions |
10,000psi (68,9 MPa) |
CASING |
DISSOLVABLE FRAC PLUG (BALL DROP PLUG) |
|||||||
Size In. (mm) |
Weight range lb/ft (kg/m) |
Max OD In. (mm) |
Min ID In. (mm) |
Length In. (mm) |
Frac Ball OD In. (mm) |
Material |
Temp. rating ° F (°C) |
Pressure rating psi (MPa) |
3.500 (114.30) |
7.7 - 10.3 (11.46 - 15.18) |
2.677 (68.00) |
1.810 (46.00) |
12.600 (320.00) |
1.750 (44.45) |
Dissolvable |
As per Real Downhole Conditions |
10,000psi (68,9 MPa) |
4.000 (101.60) |
10.7 - 18.9 (16.37 - 28.13) |
2.835 (72.00) |
1.180 (30.00) |
12.600 (320.00) |
2.000 (50.80) |
Dissolvable |
As per Real Downhole Conditions |
10,000psi (68,9 MPa) |
4.500 (114.30) |
11.6 - 15.1 (17.26 - 22.47) |
3.500 (89.00) |
1.850 (47.00) |
12.600 (320.00) |
1.850 (47.00) |
Dissolvable |
As per Real Downhole Conditions |
10,000psi (68,9 MPa) |
5.000 (127.00) |
18.0 - 21.4 (26.78 - 31.84) |
3.740 (95.00) |
2.087 (53.00) |
12.992 (290.00) |
2.756 (70.00) |
Dissolvable |
As per Real Downhole Conditions |
10,000psi (68,9 MPa) |
5.500 (139.70) |
23.0 - 26.8 (34.22 - 38.69) |
4.055 (103.00) |
2.087 (53.00) |
11.496 (292.00) |
2.756 (70.00) |
Dissolvable |
As per Real Downhole Conditions |
10,000psi (68,9 MPa) |
5.500 (139.70) |
17.0 - 23.0 (25.30 - 34.22) |
4.173 (106.00) |
2.087 (53.00) |
11.496 (292.00) |
3.000 (76.20) |
Dissolvable |
As per Real Downhole Conditions |
10,000psi (68,9 MPa) |
Application
To verify the high-temperature pressure and sealing performance of Dissolvable Frac Plugs, the casing test fixture was placed in a high-temperature test apparatus and heated to 93°C. Once the temperature stabilized, the pressure was gradually increased to 70 MPa and held for 24 hours, followed by a 15-minute pressurized period. No significant pressure drop was observed, indicating that the pressure and sealing performance of the bridge plug met the requirements for field fracturing operations.


According to the current models of shale gas operations, the working life of dissolvable bridge plugs is 24 hours, which is sufficient for meeting the field operations requirements for shale gas wells. To put it simply, from the moment the soluble bridge plug is deployed, fracturing operations can be carried out within 24 hours. Any performance testing for soluble bridge plugs can be conducted based on the 24-hour working life.
Delivered Photos



Our Packages are tight and convenient for storage, we make sure Dissolvable Frac Plug safely reach client fields even after thousands of kilometers long trip transportation by sea and by truck. we also have our inventory which can meet the reauirements of large and urgent orders from client.
Hot Tags: dissolvable frac plug, China, manufacturers, supplier, in stock, API, oilfield, buy, competitive price, high quality, fast delivery, look for, North Seeking Gyroscope, Gyro While Drilling, Solid state Gyro, Self North Seeking Gyro, Wireline Perforatingjet perforating guns, perforating gun components
You Might Also Like