+86-029-81161513

Latest Products

  • Hydraulic Dual Line Sliding Sleeve
  • Vigor Bi-directional Downhole Barrier Valve (Remote Opening)
  • Vigor Downhole Electrical Cutting Tool (VECT)
  • Vigor Electrical Tubing-Casing Punching Tool (VEPT)
  • Wireline-Conveyed Thermit-Jet Cutting Tool (WTCT)
  • ProGuide™ Series Gyro Inclinometer
  • ProGuide™ Continuous Gyro Inclinometer
  • Vigor VTracTM Wireline Tractor
  • Vigor Hydraulic Logging Truck
  • Vigor Skid-Mounted Wireline/Slickline Unit
  • Vigor Coiled Tubing Unit
  • Vigor Conventional Production Logging Tools (VPLT)
  • Vigor Gyro While Drilling (Wireless)
  • Vigor Gyro While Drilling (Wireline)
  • Vigor Tubing Encapsulated Cable (TEC)

Contact Us

  • 23 F, Building B, Zhong Tou International Building, No.10 Jin Ye I Road, High-Tech Zone, Xi'an, Shaanxi, China 710077
  • info@vigorpetroleum.com
  • +86-029-81161513
Vigor Mirage™ Dissolvable Frac Plug (Ball in Place)

Vigor Mirage™ Dissolvable Frac Plug (Ball in Place)

Vigor dissolvable frac plug-and-perf system uses degradable plugs rather than composite plugs to isolate zones during stimulation. This flexible system is suitable for cemented, uncemented, vertical, deviated, or horizontal applications in shale, sandstone, dolomite, and other technologies.
Vigor MirageTM Dissolvable Frac Plug (Ball in Place) operates like a traditional frac plug and can be set anywhere in the wellbore to isolate individual zones. The dissolvable frac plug is composed of a high-strength metal that degrades completely in wellbore fluids.

Description

China Vigor Drilling Oil Tools And Equipment Co., Ltd. is one of the most professional manufacturers and suppliers of vigor mirage™ dissolvable frac plug (ball in place) in China, featured by competitive price and fast delivery. Welcome to buy high quality vigor mirage™ dissolvable frac plug (ball in place) in stock here from our factory.

 

 

Vigor MirageTM Dissolvable Frac Plug (Ball in Place) is a new generation solutions for the unconventional completions. This high-performance frac plug provides zonal isolation for pump down applications during wellbore stimulation. The large bore I.D. allows operators to produce through the plug while it remains in the wellbore and begins the dissolution process immediately following fracturing. Both of the body and the element can be dissolved, full wellbore I.D. is achieved after complete dissolution, eliminating the need for drilling out, thus help saving time and cost.

Vigor MirageTM Dissolvable Frac Plug Ball in Place-2

Features

Vigor MirageTM Dissolvable Frac Plug Ball in Place-4

High Compressive Strength: Designed to withstand operations in medium and deep wells, with all components, including sealing parts, made from degradable materials that leave no residue after dissolution.

 

Specialized Fracturing Bridge Plug: Equipped with a central production channel, allowing direct production after fracturing. The plug fully dissolves in wellbore fluid, eliminating the need for drilling.

 

Enhanced Performance: Compared to rubber-tube-sealed soluble bridge plugs, it offers better temperature adaptability-performing well in both lower and higher temperature ranges-and ensures thorough dissolution post-construction.

 

Drillability: In special cases where removal is required, the plug can be efficiently drilled out using standard high-performance milling tools.

Field Application

Running Procedure

It is recommended to perform a gage ring or dummy run prior to installing any frac plugs in a wellbore to ensure that the wellbore is free from obstructions. Prior to running each plug the wellbore should be flushed clean of any sand that may be leftover from the previously fracked stage. A plug cart (or tension cart) should be used with lifting the lubricator to the wellhead. Do not place the weight of the gun string on the plug when going in the wellbore or on the end of the setting adapter kit when removing the setting tool from the wellbore.

 

Vertical Section

The maximum recommended RIH speed is 500 fpm in the vertical. If approaching fluid level, the speed should be reduced to 100 fpm.

Vigor MirageTM Dissolvable Frac Plug Ball in Place
Vigor MirageTM Dissolvable Frac Plug Ball in Place-3

Horizontal Section

Higher line speeds are better in the horizontal section as long as line tension remains under acceptable levels. Maximum recommended pump rate in the horizontal is 16 bpm. Monitor line tension when approaching the KOP. Begin pumping at 2 bpm as line tension decreases at the curve and increase at 2 bpm increments as needed.

 

Setting The Mirage Dissolvable Frac Plug

A standard set power charge is recommended for the setting tool. Pull tension into the wireline during plug setting to make sure setting tool moves up-hole after setting. Record overpull tension prior to setting the plug and compare to after setting the plug. Do not go back downhole to "check" plug after setting. Checking the plug set is possible with pressure when pumping the ball into seat in the future.

Techinical Parameter

Casing

Dissolvable Frac Plug (Ball in Place)

Size

In. (mm)

Weight Range

lb/ft (kg/m)

Max. O.D.

In. (mm)

Min. I.D.

In. (mm)

Length

In. (mm)

Frac Ball O.D.

In. (mm)

Material

Temp. Rating

° F (° C)

Pressure Rating

psi (MPa)

4.500

(114.30)

11.6 - 15.1

(17.26 - 22.47)

3.500

(89.00)

0.905

(23.00)

12.205

(310.00)

1.260

(32.00)

Dissolvable

As per Real

Downhole

Conditions

10,000 psi

(68,9 MPa)

5.000

(127.00)

18.0 - 21.4

(26.78 - 31.84)

3.740

(95.00)

0.984

(25.00)

12.205

(310.00

1.378

(35.00)

5.500

(139.70)

23.0 - 26.8

(34.22 - 38.69)

4.055

(103.00)

1.024

(26.00)

12598

(320.00)

1.417

(36.00)

5.500

(139.70)

17.0 - 23.0

(25.30 - 34.22)

4.173

(106.00)

1.102

(28.00)

12.598

(320.00)

1.496

(38.20)

 

Vigor Mirage™ Dissolve Frac Plugs (Ball in Place) Technical Parameter

Casing Information

Dissolvable Ball Drop Frac Plug Information

Well Conditions

Casing O.D.

Setting Range

Casing Grade

Max. O.D.

Min. I.D.

Frac Ball O.D.

Overall Length

Releasing Force

Pressure Differential

Temp Rating

Injection Fluid

Well Fluid

(In./mm)

(In./mm)

/

(In./mm)

(In./mm)

(In./mm)

(In./mm)

(KN)

(psi/Mpa)

℉/℃

(CL`) %

(CL) %

5
[127]

4.000-4.276
[101.6-108.6]

≤P110

3.74
[95.00]

0.984
[25.00]

1.375

[35.00]

12.205
[310.00]

120-140

10,000
[70.00]

194-248
[90-120]

1%

0%

Note:
① The Mirage ™ Dissolve Frac Plugs (Ball in Place) should be set by a standard Baker-10# E-4 Setting Tool or equivalent.
② The Mirage ™ Dissolve Frac Plugs (Ball in Place) will hold Max.10,000psi Top Pressure differential @90-100℃ well temperature and no less than 48 hrs, but fully dissolved within 7 days after it.
③ Dissolving Promotion Method (If required): If the bridge plug is required to dissolve faster after job, the right method is to filled up the wellbore with 3% KCL liquid for promotion.

 

Hot Tags: Vigor Mirage™ Dissolvable Frac Plug (Ball in Place), China, manufacturers, supplier, in stock, API, oilfield, buy, competitive price, high quality, fast delivery, look for, Gunshot wounds, perforating gunshot wound definition, Perforating Gun Systems, perforating gun in oil well, Wireline Perforatingjet perforating guns, perforating gun assembly

Send Inquiry

(0/10)

clearall