Contact Us
- 23 F, Building B, Zhong Tou International Building, No.10 Jin Ye I Road, High-Tech Zone, Xi'an, Shaanxi, China 710077
- info@vigorpetroleum.com
- +86-029-81161513
-
28/Oct
2026
Polished Rod Seal Surface and Grade Selection
The polished rod is the one piece of a rod pumping system that a crew touches every day and inspects almost never. It passes through the stuffing box thousands of times a week, car
-
28/Oct
2026
Hydraulic Disconnect Ball Release in Coiled Tubing
A coiled tubing string that cannot be pulled is an expensive situation, and the difference between a fishing job and a recovery is usually a joint that was installed for exactly th
-
28/Oct
2026
Flow Coupling Placement Against Turbulent Erosion
A gas well producing at high rate through a completion nipple will cut metal, and it will do it quietly. The restriction accelerates the flow, the pressure drop creates eddies just
-
28/Oct
2026
North-Seeking Gyro Survey in Magnetic Terrain
Surveying a borehole through magnetite, banded iron or an old cased well is where magnetic instruments stop being trustworthy. Magnetometers measure the earth's field plus ever
-
28/Oct
2026
Dissolvable Frac Plug Ball-in-Place Stage Isolation
A plug-and-perf stage ends with a decision that shows up weeks later: how the plug is removed. Milling composite plugs costs rig time, and on a long lateral the coiled tubing work
-
28/Oct
2026
Non-Rotating Casing Scraper for Completion Cleanup
On most completion jobs the scraper run is treated as a formality until a packer fails to hold or a gauge cutter comes back with cement packed into its blades. The non-rotating cas
-
15/Oct
2026
Sucker Rod Grade Selection for Rod Lift
A sucker rod string is the cheapest part of a beam pump installation and the part that fails most often. Every stroke loads it in tension, then in compression on the downstroke, an
-
15/Oct
2026
Rotary Wash Tool Sizing and Nozzle Arrays
Most cleanout jobs are planned around pump rate and trip speed, but the decision that actually determines whether the job works is made earlier: which body size and nozzle array go
-
15/Oct
2026
API 5CT Tubing Grade Selection by Service
Tubing is specified by three numbers - outside diameter, mass per unit length and grade - and the third is the only place where the service environment enters the order. Grade is n
-
15/Oct
2026
Slotted Casing Slot Geometry for Sand Control
Sand control with slotted casing comes down to one dimension and one ratio. The slot width has to be narrow enough to stop the formation sand, and the open area has to be large eno
-
15/Oct
2026
Tubing Encapsulated Cable Selection for Downhole Gauges
A downhole gauge is only as reliable as the cable that reaches it, and the cable is the component most likely to be damaged before it ever gets downhole. Tubing encapsulated cable
-
15/Oct
2026
Logging Flexible Sub: Passing Kickoff Points
A tool string that runs vertically has no reason to bend, so it is built as straight and stiff as its sensors allow. The moment a well turns horizontal, that stiffness becomes the