+86-029-81161513
  • 28/Oct

    2026

    Polished Rod Seal Surface and Grade Selection

    The polished rod is the one piece of a rod pumping system that a crew touches every day and inspects almost never. It passes through the stuffing box thousands of times a week, car

  • 28/Oct

    2026

    Hydraulic Disconnect Ball Release in Coiled Tubing

    A coiled tubing string that cannot be pulled is an expensive situation, and the difference between a fishing job and a recovery is usually a joint that was installed for exactly th

  • 28/Oct

    2026

    Flow Coupling Placement Against Turbulent Erosion

    A gas well producing at high rate through a completion nipple will cut metal, and it will do it quietly. The restriction accelerates the flow, the pressure drop creates eddies just

  • 28/Oct

    2026

    North-Seeking Gyro Survey in Magnetic Terrain

    Surveying a borehole through magnetite, banded iron or an old cased well is where magnetic instruments stop being trustworthy. Magnetometers measure the earth's field plus ever

  • 28/Oct

    2026

    Dissolvable Frac Plug Ball-in-Place Stage Isolation

    A plug-and-perf stage ends with a decision that shows up weeks later: how the plug is removed. Milling composite plugs costs rig time, and on a long lateral the coiled tubing work

  • 28/Oct

    2026

    Non-Rotating Casing Scraper for Completion Cleanup

    On most completion jobs the scraper run is treated as a formality until a packer fails to hold or a gauge cutter comes back with cement packed into its blades. The non-rotating cas

  • 15/Oct

    2026

    Sucker Rod Grade Selection for Rod Lift

    A sucker rod string is the cheapest part of a beam pump installation and the part that fails most often. Every stroke loads it in tension, then in compression on the downstroke, an

  • 15/Oct

    2026

    Rotary Wash Tool Sizing and Nozzle Arrays

    Most cleanout jobs are planned around pump rate and trip speed, but the decision that actually determines whether the job works is made earlier: which body size and nozzle array go

  • 15/Oct

    2026

    API 5CT Tubing Grade Selection by Service

    Tubing is specified by three numbers - outside diameter, mass per unit length and grade - and the third is the only place where the service environment enters the order. Grade is n

  • 15/Oct

    2026

    Slotted Casing Slot Geometry for Sand Control

    Sand control with slotted casing comes down to one dimension and one ratio. The slot width has to be narrow enough to stop the formation sand, and the open area has to be large eno

  • 15/Oct

    2026

    Tubing Encapsulated Cable Selection for Downhole Gauges

    A downhole gauge is only as reliable as the cable that reaches it, and the cable is the component most likely to be damaged before it ever gets downhole. Tubing encapsulated cable

  • 15/Oct

    2026

    Logging Flexible Sub: Passing Kickoff Points

    A tool string that runs vertically has no reason to bend, so it is built as straight and stiff as its sensors allow. The moment a well turns horizontal, that stiffness becomes the