+86-029-81161513

Utilization Of Wireline Well Tractor In Horizontal Well

Jan 20, 2026

The number of horizontal and extended reach wells worldwide is dramatically increasing. It is possible to drill and complete ERD, long horizontal and designer wells with no greater difficulty. However, when a requirement for intervention in these type of wells occurs and in particular for live well intervention, coiled tubing or snubbing operations have up to now been the only options. In many cases and particularly in wells with high well head pressure coiled tubing and snubbing operations are impractical and involve a large amount of costly equipment, personnel and rig time. Logistical problems, in particular for coiled tubing operations are evident, especially for ERD type wells as the coiled tubing reel weight often exceeds the platform crane capacity.

The costs for these horizontal and deviated well intervention operations with coiled tubing or snubbing are excessive and in many cases operations such as production logging is simply not performed because of the costs involved.

 

 

Utilization of Wireline Well Tractor in horizontal Well

 

 

Background

Growing gas resource exploitation in Saudi Arabia has increased activity in drilling deep, high pressure gas reservoirs with marginal to low permeability. Such wells generally require stimulation operations to induce production.

To increase the reservoir contact area, a significant number of wells are constructed with long reach horizontal sections. Multistage fracture operations are primarily conducted using plug and perforation technology to establish reservoir connectivity and production.
The stimulation work involves multidisciplinary teams conducting simultaneous operations in a limited work space and time.

 

Challenges

Effective deployment of cement and casing inspection tools in the horizontal section.

Safe, reliable, and efficient technology to convey the perforating Bottom Hole Assembly (BHA) to the target depths in the long horizontal section during some stages of the plug and perforation operations.

Available, reliable, and readily deployable contingency perforating option for plug and perforation operations.

 

HPHT horizontal gas wells

High-Pressure, High-Temperature (HPHT) horizontal gas wells have traditionally been challenging for performing tractor operations because of reliability issues. Recent technical improvements have enhanced the operating range of the tractor, enabling more consistent and dependable operations in these environments.

Based on the experience of conducting several plug and perforation stimulation jobs in Saudi Arabia, the electric-line (e-line) tractor has proven to be a reliable and consistent well intervention solution. The tractor-conveyed cement evaluation tools have produced high quality interpretable data used to design the multistage fracture job. Post-fracture diagnostic work has also been successfully performed in the horizontal sections to evaluate tubular integrity, providing valuable information for future fracture design.

Moreover, tractor-conveyed perforating has proven to be an effective solution for conducting stage-1 toe perforations in comparison to other options from several aspects. The option of contingency perforating in a closed system without fluid injectivity into the previously perforated stages has helped to maintain the continuity of operations.

 

Rooted in Vigor's advanced engineering, the VTrac Wireline Tractor delivers exceptional reliability and ease of maintenance, making it the preferred downhole solution for leading operators worldwide. Its field performance is proven, having successfully completed over a thousand operations across the globe and earning consistent, positive feedback from both direct clients and end-users. To ensure seamless integration and operational success, Vigor provides comprehensive support-from initial planning to on-site execution by our expert engineering teams. Choose the VTrac for a smarter, more dependable path to downhole success. Contact us today to learn how our proven technology can elevate your next project. For more information, you can write to our mailbox info@vigorpetroleum.com & marketing@vigordrilling.com

info-566-640

 

Send Inquiry